Save Money, Save Time, Save Energy

Power Factor Correction, Power Quality and Energy Saving Solutions

Power Factor Correction

Reactive Power Charges and Excess Availability Charges are direct savings your site can benefit from with Power Factor Correction equipment

Active Harmonic Filtration

PFC Engineering offer a full harmonic analysis, design and installation service for active harmonic filtration systems, to provide an optimal harmonic filtering solution tailored to your sites specific needs.

Power Quality

A Power quality analysis are carried out on commercial and industrial sites and is a vital service to diagnose and solve your complex power related issues.

Energy Metering

Together with our partners at Go Monitor, collecting data and monitoring your site equipment has never been easier.

Surge Protection

Surge Protection Devices (SPD’s) are parallel connected devices whose sole purpose is to divert potentially damaging voltage transients to earth.

Voltage Optimisation

Optimising your Voltage from 240V to around 220V can save a significant amount of energy for commercial and industrial sites.

Why Choose Us?

Established in 1976, we’ve provided over 50-years of support to our customers; saving thousands each year through our energy saving equipment.

In addition to high quality products, we offer:

Safety and Security

We are SafeContractor approved and hold ISO9001 accreditation

24×7 Support

Planned Preventative Maintenance & Emergency Call-outs

Nationwide Service

We support the whole of the UK and offer Free Surveys for new sites

We design, construct and install bespoke energy saving systems

At PFC Engineering Ltd, we take pride in offering the correct solution for the job. There’s no “one size fits all” in our industry – we assess every situation on an individual basis. Whether it’s power factor correction, power quality, voltage optimisation or energy monitoring, it’s the same process.

We recommend contacting us to find out whether our products can help you. If they can, we’ll provide budget prices, calculate initial payback figures and look at arranging a free survey to verify our calculations.

If they can’t, we’ll say so. There’s no hard sell when the numbers speak for themselves.

Accreditations

Latest News

PFC Upgrade at Magistrates Court

Power Factor Correction Upgrade at Magistrates Court – South of England At PFC Engineering, we’re often called in to assess and resolve issues where existing power factor correction (PFC) systems are no longer suitable for the demands of…
,

Power Factor Replacement in Central London

Central London Offices – PFC System Replacement At PFC Engineering, we recently completed a comprehensive power factor correction (PFC) upgrade for a large office building in central London, replacing ageing components with a modern, high-performance…
,

Electrical Riser Metering with Remote Monitoring

We were commissioned to design and deliver a remote monitoring solution within a high-rise office building in central London. The brief was to provide accurate monitoring of standard load and power consumption across multiple power and lighting…
,

Surge Protection Replacement at Office Building

During the annual Power Factor Correction (PFC) service, an inspection of the on-site Surge Protection Device (SPD) identified reduced protection levels on two of the three phases. This degradation is most likely attributable to a recent voltage…

Merry Christmas 2025

Wishing all of our customers a Merry Christmas and Happy New Year We look forward to working with you again in 2026!
,

Active Harmonic Filter Installation – Alloa, Scotland

Initial Site Condition The existing Power Factor Correction (PFC) system at the site was rated at 300 kVAr, configured in three stepped stages. On inspection, the following conditions were recorded: Step 1: Operating at ~55% capacity,…
,

PFC Replacement – Gym, Newcastle upon Tyne

Initial Findings During a maintenance visit, the site’s existing power factor correction (PFC) equipment was found to be in a failed state. The following issues were identified: 4 x 125 A DIN fuses had blown, leaving the system unprotected. …
,

Fire Station – Voltage Optimisation Replacement

A routine maintenance visit identified multiple issues with the existing voltage optimisation (VO) equipment installed at the fire station. The site operates without a standby generator; however, UPS backup is available for essential services,…
,

PFC Upgrade at Community College, Crawley

During a planned maintenance visit to the college’s LV distribution system, engineers discovered a complete failure of the existing power factor correction (PFC) equipment. All six 25 kVAr capacitor units had failed, and four 100 A DIN fuses…

Get In Touch

Contact us to find out how we can help you save money, save energy and save time.

This contact form is deactivated because you refused to accept Google reCaptcha service which is necessary to validate any messages sent by the form.