PFC Rebuild at Chilled Distribution Depot
Following a site inspection, it was found that site required a full rebuild of their 300kVAr panel-built Power Factor Correction.
We recommended replacing the existing failed capacitor tray assemblies with our own SBA 100 trays which included all new 480V rated capacitors, soft switching IMO MC62 contactors and sub fusing for all stages. This unit would be made up of 6 stages of 50kVAr and would be controlled by a Lovato DCRL8 digital control relay.
Our engineer completed the full rebuild in 1 day without any disruption to site and the unit was fully commissioned and left operating upon completion.